Phase 6b priorities ← AI team

2026-07-04 16:35 UTC
- All three advisors reached unanimous consensus on prioritization order without dissent - Token/cost dashboard tracker ranked #1 across all personas — rationale centers on observability and spend visibility as a prerequisite for scaling decisions - Phase 3b persona runtime wiring ranked #2 — framed as core product infrastructure that blocks demos, customer acquisition, and everything built on top - Phase 5b retrofit of 14 projects ranked #3 — consistently characterized as cleanup/maintenance work that should wait until the foundation is stable and generating real data
high Ship token/cost dashboard tracker eugene pending
high Execute Phase 3b persona runtime wiring eugene pending
low Schedule Phase 5b retrofit of 14 projects for backlog after Phase 3b is complete eugene pending
**Eugene:** Which of these should ship first — token/cost dashboard tracker, Phase 5b retrofit of 14 projects, or Phase 3b persona runtime wiring? One-sentence recommendation each. **Aria 👑:** **Token/cost dashboard tracker** — Ship this first; you need visibility into spend before scaling anything else. **Phase 3b persona runtime wiring** — Second, because live personas are the product core and every demo depends on it. **Phase 5b retrofit of 14 projects** — Last; retrofitting existing projects is cleanup, not momentum, and it waits until the foundation above is solid. **Nexus 🔧:** **Token/cost dashboard tracker** — Ship it first; you can't make infrastructure decisions without observability into what the system is actually consuming. **Phase 3b persona runtime wiring** — Second; the runtime is the load-bearing wall everything else bolts onto. **Phase 5b retrofit** — Last, full stop; retrofitting 14 projects against an unwired runtime is rework on top of rework. **Ledger 💰:** **Token/cost dashboard tracker** — Ship this first; without spend visibility you're flying blind on unit economics, and that's unacceptable before any scaling decision. **Phase 3b persona runtime wiring** — Second; this is revenue-generating infrastructure, and every day it's unwired is a day you can't close a demo or book a customer. **Phase 5b retrofit of 14 projects** — Last; this is a balance sheet cleanup item, not a P&L driver, and it belongs in the backlog until the two above are generating real data.